When the North stand of the iconic Sydney cricket ground was being redeveloped the architects aim was to showcase the next evolution of stadia design in Australia. This meant the four hot water plants were required to fit around the buildings complex shape and design. We got to work and manufactured each plant, in our state of the art factory, to squeeze into its designated area whether external or internal. Each hot water package was fully plumbed and mounted on stainless steel skid bases ensuring minimal site assembly. The players amenities plant was the most challenging of the four as it is an internal plant set under the stands making the fan assisted flueing very difficult to achieve…………but we did of course!
Rinnai’s Hot water solution
Main kitchen plant 1 = Demand Duo 6 internal with fan assisted common flue and ringmain dual pump set
Players amenities plant 2 = Demand Duo 6 internal with fan assisted common flue
Secondary kitchen plant 3 = Demand Duo 6 internal with fan assisted common flue and ringmain dual pump set
Bar hot water plant 4 = Demand Duo 6 external and ringmain dual pump set